• Home
  • Games
    Action-adventure Simulation Business Role Playing Sports Competition Casual Intelligence Card Strategy Music Rhythm Text Puzzle Flying Shooting Love Development
  • Apps
    Business Office Newsletter Social Life Entertainment Online Shopping Practical Tools Travel Financial Management Educational Learning Information Reading Sports and Health
  • Articles

English 中文(简体) 中文(繁体) 한국어 日本語 Português Español Русский العربية Indonesia Deutsch Français ภาษาไทย
Home Apps Business Office GTM LoadShed
GTM LoadShed

GTM LoadShed

1
2
3
4
5
Download
  • Version 2.3.0
  • Category Business Office
  • Package Name com.embarcadero.GTMLoadShed
  • Update Time July 22, 2025
  • Size 8.03MB
About this app

Provides simplified info on loadshedding for Greater Tzaneen Municipality.

This app attempts to take the confusion out of the Greater Tzaneen Municipality's publicly published load shedding schedule.

- By defining your area the app will tell you if you are subject to load shedding or not.

- Indicates whether Eskom is load shedding and, if so, at which stage.

- Receive notifications on Eskom stage changes as well as your area's load shedding status.

- Receive notifications when your area's load shedding is about to start.

- Provides contact information for GTM for power related queries.

- Plus, more exciting features to come...

*Disclaimers:

- Please note that this is a private third-party app which is NOT affiliated or endorsed by the Greater Tzaneen Municipality, Eskom, or any other governmental organisation. This app also does not represent these entities in any way.

- The information used in this app is obtained from publicly available sources, specifically the load shedding schedule distributed to the public by the Greater Tzaneen Municipality from time to time through their website and other community communication channels.

- This app is intended only as a secondary helper tool and not as the primary source of information. Users of this app should understand that although the app will endeavour to provide correct information at all times, it might be incorrect from time to time. The most up to date and correct information will always be the sources listed below (eg. GTM and Eskom themselves) which should be consulted as the primary source of truth.

*Information sources

- GTM LoadShedding schedule as published on the GTM website at https://www.greatertzaneen.gov.za/?q=load_shedding

- Eskom loadshedding stage information as published on the Eskom website at https://loadshedding.eskom.co.za/

What's New in the Latest Version 2.3.0

Last updated on Jan 10, 2023 - Implemented the new hybrid GTM schedule.
Download(8.03MB)
Users also viewed
  • Material Design Demo

    Material Design Demo

    1.0 November 17, 2025
  • Real Password Hacker Pro Prank

    Real Password Hacker Pro Prank

    1.00 November 17, 2025
  • Time Travel

    Time Travel

    v1 November 17, 2025
  • Flash Light or Torch (Dancing)

    Flash Light or Torch (Dancing)

    1.0.2 November 16, 2025
  • free 100 gb 4g 3g prank

    free 100 gb 4g 3g prank

    1.0 November 16, 2025
  • Wireless Image Utility 1.2.2

    Wireless Image Utility 1.2.2

    1.2.2 November 15, 2025
  • Love Moment

    Love Moment

    0.00 November 14, 2025
  • videplays for FIFA 15 Trick

    videplays for FIFA 15 Trick

    1.0 November 14, 2025
  • LapseDROID (lite)

    LapseDROID (lite)

    1.0.0 November 12, 2025
  • My Notepad

    My Notepad

    1.1 November 11, 2025
  • Logo Design, Maker & Creator.

    Logo Design, Maker & Creator.

    1.3 November 10, 2025
  • Clapper for Android

    Clapper for Android

    1.2 November 9, 2025
  • SelfMail

    SelfMail

    2.0.13 November 8, 2025
  • vCommerce SHOPPING APP DEMO

    vCommerce SHOPPING APP DEMO

    2.0 November 7, 2025
  • Qonnections 2015

    Qonnections 2015

    1.1 November 7, 2025
About Privacy Policy Terms of Service Cooking Policy

© Copyright 2017-2025 downzr.com